BENEFITS OF USING OUR PRECAST CONCRETE COMPONENTS
Where pipes and precast pits are laid, backfilled and completed together, as in subdivisional drainage works, substantial savings in plant and labour costs can be achieved. Excavation for the pits can be roughed out by the excavator and the only trim required is that for the select material beneath the pit base.

 

Design by MCconception